Skip to content
Get matched

Guides / Quality

First article inspection for plastic molded parts: what to require and how to review it

November 9, 2026

A first article inspection (FAI) is a full check of the first parts made from a new mold, measured against every requirement on the drawing and recorded in a report. It proves that the mold, the material and the process can make a part that meets the drawing before you release production. For molded plastic parts, a good FAI report includes a ballooned drawing, dimension results for every cavity, material and process records, photos and a decision. Below is what to require, how to review it and what to do when the parts fail.

FAI, T1 samples and PPAP

These terms overlap, so be clear about which you ask for.

  • T1 samples are the first parts from a new mold. They are used to check fit and find corrections. A T1 report is often a short dimensional check. See T1, T2 and T3 mold trials.
  • First article inspection is the formal report for a part that is ready to approve, often on the final trial after corrections. It covers every characteristic on the drawing.
  • PPAP is the automotive approval package that includes the FAI-type results and more. See PPAP for injection molding.

For many industrial and consumer parts, an FAI report on the approved trial is enough. For aerospace work, buyers may require the AS9102 forms. For automotive, expect PPAP. Ask which format your customer expects before you issue the PO.

What the FAI report must contain

Section What it shows
Identification Part number, revision, mold number, cavity numbers, date, resin and lot
Ballooned drawing Every dimension and note numbered, so each reading has a reference
Dimension results Measured value for each characteristic, each cavity, with pass or fail
Method and gauge How each value was measured and with which instrument
Material evidence Resin grade, supplier certificate and lot number
Process record Machine, key settings and cycle time used for the sample
Visual check Photos of the part and any cosmetic limits applied
Functional checks Fit, assembly, torque, leak or other tests in the drawing
Special characteristics Critical and safety features flagged with extra readings
Decision Approved, approved with conditions or rejected, with a signature

The ballooned drawing is the backbone of the report. Without it, the buyer cannot tell which dimension a reading belongs to, or whether a feature was skipped.

Sample size and which parts to measure

Plastic parts from one mold are not identical. In a multi-cavity mold, each cavity has its own dimensions. Parts from the same cavity vary slightly shot to shot.

Minimum practice:

  1. Measure parts from every cavity.
  2. Measure more than one part per cavity on critical dimensions, to see the spread.
  3. Mark each part with its cavity number, so readings trace back to a cavity.
  4. Keep the measured parts as retained samples, labeled, for later comparison.

State the quantity in the PO. A common request is a few parts per cavity, and more for tight tolerances. If a feature is critical, ask for several consecutive shots to check that the process is stable, not only one lucky shot.

Timing, conditioning and measurement method

Plastic dimensions change after molding. Parts shrink as they cool and may keep shrinking for hours. Nylon absorbs moisture and grows over days. Measuring too early gives numbers that do not match the part in use.

Agree these points in writing:

  • Wait time before measurement, commonly 24 hours or more at room temperature.
  • Conditioning for hygroscopic resins, for example nylon.
  • Temperature in the lab, typically around 20 to 23 degrees C.
  • Fixturing for flexible parts, so the part is held in a defined way. A thin part can measure differently when clamped, so the support method should be on the drawing or in the plan.
  • Instrument for each feature. A caliper is not suitable for a feature with a tolerance of a few hundredths of a millimeter. A CMM, vision system or pin gauge may be needed.

Soft plastics deflect under probe force. Non-contact measurement often suits them better. Ask the plant to describe how it handles this.

Tolerances and GD&T

The report is only as good as the drawing it checks. A drawing with every dimension at the tightest tolerance forces extra measurement and often cannot be held. Set tolerances on the features that matter for fit and function, and open the rest. Typical molding tolerance ranges are covered in injection molding tolerances. If the drawing uses datums and geometric tolerances, make sure the plant can measure them from the datum setup you specified. See GD&T for molded parts.

Need a quote for a molded part? Get matched with a molding plant

How to review the report

Do not only read the pass or fail column. Check these in order.

  1. Completeness. Is every ballooned dimension and note present? Are all cavities covered?
  2. Raw numbers. Do the readings look measured, or do they all sit at nominal? Real data shows scatter.
  3. Near-limit values. Which features are close to the tolerance edge? A part that barely passes will fail when the process drifts. Flag those for monitoring.
  4. Cavity spread. Is one cavity consistently different? Ask for a mold correction or a documented offset.
  5. Method. Does the method suit the feature?
  6. Material and process. Do the resin grade and lot match the PO? Do the process settings look like a stable setup, or an unusual one?
  7. Visual. Check photos against cosmetic limits. See limit samples for cosmetic defects.
  8. Function. Fit the parts into your assembly, if possible, before you sign.

Measure a few critical features yourself or through a third party on your side if the program is large. Compare with the plant’s numbers.

When the parts fail

Failure on the first article is normal. The question is what happens next.

  • Ask for a written list of nonconforming characteristics, by cavity.
  • Ask for the root cause: mold dimension, process, material or drawing issue.
  • Agree the correction: steel change, process change or drawing change. Steel corrections go through the mold maker and take time.
  • Agree whether the next round is a full FAI or a partial one on the corrected features.
  • Record the revision and the decision.

Do not accept “we will fix it in production”. Production should start only after an approved first article, or with written conditions.

After approval

The approved first article becomes the reference. Keep:

  • The approved report and the retained sample parts.
  • The process sheet that produced them.
  • The agreed inspection plan for production, including sampling. See AQL inspection for plastic parts.
  • A rule that a new FAI is needed after a major change such as a mold repair, mold transfer, new press, new resin grade or a drawing revision.

For long programs, add ongoing process capability data on critical dimensions, see Cpk in injection molding.

What to put in the PO

  • FAI required on the final trial, with the report format.
  • Quantity per cavity and which features get multiple readings.
  • Wait time and conditioning before measurement.
  • Retained samples sent to the buyer, with cavity marks.
  • Approval needed before production release.
  • Re-submission triggers.

For a plant’s view of preparing this report for export buyers, see T1 sample reports for export buyers. To judge a plant’s quality system more broadly, read how to choose an injection molding factory.

Next step

We are a manufacturers’ representative for audited plastic injection molding plants. Buyers pay nothing: the plant pays us a commission on orders from buyers we introduce. Send an RFQ and state the FAI format you need, and we match it to the one partner plant whose lane fits.

Frequently asked questions

How many parts should the plant measure for first article inspection?

At minimum, parts from every cavity, because each cavity can differ. Many buyers ask for between one and five parts per cavity, and more on critical dimensions. Write the quantity in the PO so the plant measures what you expect, and ask for the individual readings, not only the averages.

When should first article parts be measured?

After the parts have cooled and stabilized. Many resins keep shrinking for hours, and nylon changes with moisture for days. A common practice is to wait at least 24 hours at room temperature, then measure. Agree the wait time and the conditions in advance.

Is a first article report the same as PPAP?

No. A first article inspection report proves that the first parts match the drawing. PPAP is a larger approval package from the automotive industry that includes the FAI-style dimensional results plus process flow, control plan, capability studies and more. Use FAI for general work and PPAP when the customer requires it.

Need a quote for a molded part?

Send the model. We match it to the partner plant whose lane fits and reply within 24 business hours. Free for buyers.

Get matched with a molding plant

Keep reading