Guides / Quality
AQL inspection for plastic parts: how sampling plans work and what to write in the PO
November 21, 2026
AQL inspection checks a random sample from a lot and accepts or rejects the whole lot based on how many defective parts it finds. You choose three things: the inspection level (which sets the sample size for a given lot size), the AQL value for each defect class, and the standard to read the accept and reject numbers from. For plastic parts, buyers usually use general inspection level II with AQL 0 for critical defects, 1.5 or 2.5 for major and 2.5 or 4.0 for minor. The exact numbers depend on the part and the end use.
What AQL means
AQL stands for acceptable quality limit (older texts say acceptable quality level). It comes from sampling standards: ISO 2859-1 and the US standard ANSI/ASQ Z1.4, which replaced the older MIL-STD-105E. The ISO standards are listed at iso.org. Check the current text of the standard before you cite a table in a contract.
The idea is simple. You cannot inspect every part, so you pull a sample. If the number of defective parts in the sample is at or below the accept number, the lot passes. If it is at or above the reject number, the lot fails.
Two limits to know:
- AQL controls the risk of rejecting good lots, not the risk of accepting bad ones. A lot with a defect rate above the AQL can still pass if the sample happens to be clean.
- A passing lot may contain defects. The sample proves only that the lot is probably within the quality level.
That is why AQL works best as a delivery check on top of a controlled process, not as the main quality control.
The three inputs
1. Lot size and inspection level
The lot size sets the sample size code letter. General inspection level II is the default for most purchases. Level I uses a smaller sample, for low-risk parts. Level III uses a larger sample, for higher-risk parts. Special levels S-1 to S-4 give very small samples for destructive or expensive tests.
2. Defect classes
Split defects into classes so each gets its own AQL:
- Critical: unsafe or a legal failure. Examples: a crack in a load-bearing part, a missing safety feature, wrong resin or banned substance. Usually AQL 0.
- Major: the part fails its function or sale. Examples: short shot, large flash that affects fit, a dimension out of tolerance on a key feature, a heavy sink on a visible face. Common AQL 1.0 to 2.5.
- Minor: a small departure that does not change function. Examples: light cosmetic marks on a non-visible face, minor flash that can be trimmed. Common AQL 2.5 to 4.0.
Write the defect list for the part in the inspection standard, with photos for the cosmetic boundaries. See how to limit sample cosmetic defects for how to draw those lines.
3. Switching rules
The standard allows tightened inspection after repeated rejections and reduced inspection after a record of acceptances. Decide whether you will use these rules or keep to normal inspection every lot.
Sample size and accept numbers
The table below shows common single sampling plans for normal inspection at general level II, as given in ANSI/ASQ Z1.4 and ISO 2859-1 tables. Verify the figures against the current standard before you rely on them in a contract.
| Lot size | Sample size | AQL 0.65 (Ac / Re) | AQL 1.5 (Ac / Re) | AQL 2.5 (Ac / Re) | AQL 4.0 (Ac / Re) |
|---|---|---|---|---|---|
| 501 to 1,200 | 80 | 1 / 2 | 3 / 4 | 5 / 6 | 7 / 8 |
| 1,201 to 3,200 | 125 | 2 / 3 | 5 / 6 | 7 / 8 | 10 / 11 |
| 3,201 to 10,000 | 200 | 3 / 4 | 7 / 8 | 10 / 11 | 14 / 15 |
| 10,001 to 35,000 | 315 | 5 / 6 | 10 / 11 | 14 / 15 | 21 / 22 |
Ac is the accept number and Re the reject number. For a lot of 5,000 parts, level II, AQL 2.5: inspect 200 parts. Accept the lot if 10 or fewer are defective. Reject it at 11 or more.
For AQL 0 on critical defects, the standard tables do not give a plan, because zero accept numbers need a different approach. The usual practice is to use the same sample size as the major class with an accept number of zero, or to agree a larger sample.
Sampling in practice
A good plan can be ruined by poor sampling.
- Random selection. Draw parts from different cartons and different pallets, and from different cavities in a multi-cavity mold. Do not let the packer choose the parts.
- Whole lot available. Sample after the lot is complete and packed, or at final packing. If the lot is still being made, sample in stages and tie each stage to a shift or a time.
- One lot, one resin lot and one mold. Mixing lots makes a sample meaningless. Define the lot in the PO, for example one production run of one part number from one resin lot.
- Cavity coverage. On a 4-cavity mold, make sure each cavity is represented. A defect from a single worn cavity is a pattern that a random sample from a mixed box can miss.
- Inspector and conditions. Agree the lighting, distance and time per part for cosmetic checks. A common rule is to view at arm’s length for a few seconds under standard light.
Need a quote for a molded part? Get matched with a molding plant
What to check and with what tools
Use the sample for checks that are quick and objective:
- Visual and cosmetic: against the approved sample and the defect photos.
- Functional: fit gauge, go/no-go gauge or mating part.
- Key dimensions: a few of the most important dimensions with a caliper or fixture.
- Marking: part number, cavity ID and date code.
- Packing: quantity, labels and carton condition.
Measure the critical dimensions on a smaller sample with proper instruments and record the values, and ask for process data for the rest. Capability data tells you more than a pass/fail count. See Cpk in injection molding for what to ask.
Where AQL falls short
- Rare, severe defects. A defect that affects one part in 2,000 can pass a sample of 200 almost every time. If it is dangerous, use process controls, vision systems or 100 percent screening.
- Defects that vary with time. A problem that appears only at the start of a run or after a tool change needs a time-based sampling plan.
- Dimensional drift. A slow trend toward a limit shows up in measured data, not in pass/fail counts.
- Assembly issues. Parts that pass alone can fail in assembly because of cumulative tolerance. Use a fit test on the real mating part.
For regulated or automotive programs, buyers add a formal approval process such as the one in PPAP for injection molding, and use AQL only for routine lot checks.
Writing AQL into the PO
Put the sampling plan in writing so that the plant and the inspector read it the same way:
- The standard and edition (for example ISO 2859-1 or ANSI/ASQ Z1.4).
- Inspection level and the type of plan (single sampling, normal inspection).
- AQL value for critical, major and minor defects.
- The defect list with photos and the definitions of each class.
- The lot definition and how samples are drawn.
- Who inspects: the plant before shipment, you on arrival or a third party.
- What happens on rejection: 100 percent sort at the plant’s cost, rework or replacement. Also state the time allowed.
- How records are kept and shared: a pre-shipment inspection report with photos and counts.
Also decide who pays for third-party inspection and when the inspector may visit. Agree this before the first order, because a dispute during a late shipment is the worst time to define it.
From inspection to supplier selection
The way a plant handles AQL says a lot about its quality system. Ask to see a sample inspection report from a past lot (with the buyer’s name removed), the defect library with photos and the sorting procedure. For a wider supplier review, use the injection molding supplier audit checklist.
If you want a plant that can work to an agreed sampling plan and report inspection results, send an RFQ and state the AQL, inspection level and defect list. We are a manufacturers’ representative: we match each RFQ to the one partner plant whose lane fits the part, resin and press range, and you order from the plant directly. The service is free for buyers, and the plant pays us a commission on orders from buyers we introduce.
Frequently asked questions
Does AQL 2.5 mean 2.5 percent of parts can be bad?
Not exactly. AQL is the quality level at which the sampling plan will usually accept a lot. A lot with a real defect rate near the AQL is accepted most of the time, and a worse lot is rejected more often. It is a sampling rule, not a promise about the defect rate of every lot.
Should critical defects use AQL?
Most buyers set AQL 0 for critical defects, meaning a single finding rejects the lot, and use a larger sample or 100 percent screening where safety is involved. Sampling cannot prove a lot has no defects, so safety features also need process controls and fixtures.
Is AQL enough to control dimensions?
No. AQL suits attribute checks such as cosmetic defects, missing features and go/no-go gauges. Critical dimensions are better controlled with process capability data (Cpk), first article reports and periodic measurement reports.