An injection molding supplier audit checks whether a plant can make your part repeatedly, not whether it can make one good sample. Use a checklist that follows the part through the plant: documents, tool room, presses, resin handling, process control, inspection, nonconforming parts and shipping. At each step, look for records as well as equipment. A plant that keeps clear records has a process. A plant that explains verbally has habits.

This checklist works on site or on a live video walk. Mark each item as pass, partial or fail, and write one line of evidence for each.

Before the audit

  • Send the plant a short agenda and a list of records you will ask to see.
  • Name the part or the part family you will use as an example.
  • Ask for a current company profile, an equipment list and a list of certificates.
  • Decide who attends: a quality engineer and a purchasing person from your side is typical.
  • Read the plant’s side of the story in molding plant audit preparation so you know what a well prepared plant looks like.

1. Company and documents

  • Business registration in the plant’s name, matching the quote.
  • Certificates (ISO 9001, IATF 16949, ISO 13485 and others if claimed): current, scope covers injection molding, issued by an accredited body. Check the certificate against the issuer’s database.
  • Quality manual or process map, and an organization chart that names the quality lead.
  • Customer confidentiality practice: how drawings and files are stored, who has access. See protecting IP in injection molding overseas.
  • Subcontracting list: which operations go outside the plant (tool making, printing, assembly, plating) and how those subcontractors are controlled.

Ask: “Which of these certificates covers the building where my part would be made?” A certificate for a head office does not cover a separate plant.

2. Tool room and mold handling

  • In-house tool room or external toolmaker, and the machines available for repair (milling, EDM, grinding, polishing).
  • Mold storage: racks, labels with part numbers, rust protection, clean and dry.
  • Mold maintenance records: shot counters, preventive maintenance schedule, repair history. See injection mold preventive maintenance.
  • Mold identification: the customer’s part number or name on each mold.
  • Mold change process: who changes molds, how long it takes, whether water lines and hot runner connections are checked.
  • Spare parts for molds in your program.

3. Presses and auxiliary equipment

  • Press list with tonnage, make and year. A range that fits your part is more important than a long list. Generic brands such as Engel, Arburg, Haitian or Sumitomo are all common.
  • Condition: leaks, worn tie bars, clean platens, working safety gates.
  • Press monitoring: screens that show the process parameters, and whether setup sheets are filed.
  • Dryers for hygroscopic resins, with temperature and dew point controls. See resin drying temperature chart.
  • Chillers and mold temperature controllers, with maintenance records.
  • Robots or conveyors if the part needs automated removal.
  • Utilities: stable power, compressed air, cooling water quality.

4. Resin handling and traceability

  • Incoming material inspection: certificate of analysis, lot number recorded.
  • Storage: sealed bags, off the floor, labeled by grade and lot, FIFO (first in, first out).
  • Drying logs: material, temperature and time per run.
  • Regrind policy: percentage allowed, who approves, how it is stored. Ask where the regrind is ground and how it is kept clean.
  • Material change control: how the plant prevents a wrong grade at the hopper.
  • Traceability from resin lot to production lot to shipment. See resin lot traceability records.

5. Process control

  • Setup sheet per mold: temperatures, pressures, speeds, cooling time, cushion, hold time and switchover. Check that the sheet at the press matches the filed version.
  • Process window study from the T1 or PPAP stage.
  • Process change control: who may change a parameter, how a change is recorded and how the customer is told. See process change notification for molded parts.
  • In-process monitoring: shot weight checks, visual checks, automatic detection if used.
  • Capability data (Cpk) on critical dimensions if you require it. See Cpk in injection molding.
  • Work instructions at the press, in the operators’ language, with photos of good and bad.

6. Quality lab and measurement

  • Equipment: calipers, micrometers, height gauge, CMM or optical measuring system, plus fixtures and gauges for your part.
  • Calibration labels on gauges, with calibration dates in range and a calibration record on file.
  • First article inspection procedure and reports. See first article inspection for plastic parts.
  • Inspection plan for your part: what is checked, how often and with which method.
  • Environment: a clean, stable bench for measuring, with a defined room temperature for tight tolerance parts.
  • Measurement competence: ask an inspector to measure a feature in front of you.

7. Nonconforming parts and corrective action

  • Red-tagged or marked area for rejected parts, with a log.
  • Scrap and rework rules: who decides, what is allowed.
  • Corrective action process: root cause method, records of recent cases. Ask for one example report. See 8D report for molded parts quality claims.
  • Customer complaint handling and response time.

Need a quote for a molded part? Get matched with a molding plant

8. Packing, labeling and shipping

  • Packing method defined per part: bag, tray or carton, with protection for cosmetic faces.
  • Labels with part number, revision, lot and quantity.
  • Final inspection before packing, with sign-off.
  • Pallet and carton specifications for export. See export packing for molded parts.
  • Shipping documents and Incoterm practice.

9. Housekeeping and safety

  • Clean floors, marked walkways, no oil pools under presses.
  • Operators wearing required protection and using safety gates.
  • Orderly storage with no mixed materials near the machines.

These items tell you about discipline. A messy floor sometimes goes with mixed resin and lost parts.

Red flags worth noting

Some findings matter more than a missing form.

  • Setup sheets that do not match the press screen. The process lives in the operator’s head.
  • Mixed or unlabeled resin bags near the hoppers.
  • Gauges without calibration dates, or inspection done with a worn caliper on a tight tolerance.
  • No mold history. The plant cannot say how many shots the mold has run or when it was last serviced.
  • Rejected parts mixed with good parts in the same carton or the same area.
  • A guide who avoids certain areas of the plant or will not open records.
  • Records that look freshly written. Entries all in the same pen and the same hand, filled in just before your visit.

One red flag is a question to ask. Several together are a reason to look elsewhere.

On site or by video

A video audit is a screen, and an on-site audit is the proof. Use video to remove plants that fail the basics: no resin control, no measuring equipment, no records. Ask the guide to follow your order of checks, point the camera at labels and screens and open files on request. Then visit the plants that remain before a large tool order, or send a third party you trust. On site, ask for records first and a walk second, so the walk confirms what the records say.

Scoring and follow-up

Use a simple scale: 2 for pass, 1 for partial, 0 for fail. Give extra weight to the items that matter for your part: material traceability for regulated parts, measurement for tight tolerances, mold maintenance for long programs. Write down actions with an owner and a date. Agree what must be closed before the PO and what can follow.

Result Typical action
Pass on all weighted items Proceed to quote and sample
Partial on a few items Agree a corrective action plan with dates
Fail on a weighted item Do not place the order until fixed and re-checked

Audit the process at least once more before production starts, and again when volume or program risk changes. For the wider selection process, see how to choose an injection molding factory and questions to ask an injection molder.

Working with a rep

We are a manufacturers’ representative for injection molding plants. Buyers pay nothing for the introduction; the plant pays us a commission on orders from buyers we introduce. Use the checklist above on any plant we introduce, as you would on any supplier. Send an RFQ with your part and your audit requirements, and we route it to the partner plant whose lane fits.

Frequently asked questions

Can I audit an injection molding supplier by video call?

Yes, as a first screen. A live video walk through the press floor, resin store, tool room and quality lab shows a lot, and you can ask the guide to point the camera at labels, gauges and records. It does not replace an on-site visit before a large tooling order, because you cannot judge smell, noise, cleanliness or what sits behind the camera.

How long does a supplier audit take?

A focused audit of a mid-size molding plant takes about half a day to one day on site (typical), plus preparation and a report. A video screen takes one to two hours. Allow time to pull records, since the records show more than the walk.

Should I rely on the supplier's ISO certificate instead of auditing?

A certificate shows that a certification body audited a quality system against a standard, within a stated scope. It does not show how the plant runs your part. Check that the certificate is current and covers injection molding, then audit the process on the floor and in the records.