Skip to content
Get matched

Guides / Choosing a Supplier

Incoterms for injection molded parts: how to choose between EXW, FCA, FOB and DDP

November 21, 2026

For injection molded parts, FCA or FOB is the usual choice when you control the freight, EXW suits only a buyer with a forwarder in the plant’s country, and DDP suits a buyer who wants one delivered price and accepts the plant’s choice of carrier. The Incoterm decides three things: where the plant’s job ends, who pays each cost on the way, and who carries the risk if the goods are damaged or lost. Pick it before you compare prices, because two quotes under different terms cannot be compared line to line.

What an Incoterm does and does not cover

Incoterms are standard three-letter trade terms published by the International Chamber of Commerce. The current edition is Incoterms 2020. They cover delivery, the point where risk passes, who pays freight and insurance, and who handles export and import clearance. A neutral overview is on the Incoterms article on Wikipedia.

They do not cover:

  • When ownership of the goods passes to you.
  • Payment terms and deposits.
  • What happens if the parts fail inspection.
  • Mold ownership or tooling release.

Those belong in the purchase order. An Incoterm is also only valid when you add a named place: “FCA Ho Chi Minh City, Incoterms 2020”, not just “FCA”. The place decides where the cost and risk split sits.

The terms buyers of molded parts actually meet

Term Plant’s job ends Export clearance Import clearance and duty Typical fit
EXW Goods ready at the plant dock Buyer Buyer Buyer with a local forwarder and a lot of experience
FCA Goods handed to the buyer’s carrier, cleared for export Plant Buyer Most air and container shipments
FOB Goods loaded on the ship at the named port Plant Buyer Sea freight, buyer books the ship
CFR / CIF Goods on the ship, plant pays sea freight (CIF adds insurance) Plant Buyer Buyer wants a landed freight number to the destination port
DAP Goods delivered to the named place, ready for unloading Plant Buyer Buyer wants door delivery but handles duty
DDP Goods delivered with import cleared and duty paid Plant Plant Small buyers who want one price, with care

CPT and CIP are the carrier-based versions of CFR and CIF for air, truck and multimodal shipments.

EXW: cheapest quote, most work

Under EXW the plant makes the parts, packs them and puts them on its dock. Everything after that is yours, including loading the truck and, in practice, export clearance. The Incoterms rules say that under EXW the seller does not clear the goods for export, and that a buyer who cannot do so should consider FCA instead.

In many countries an overseas buyer cannot file an export declaration directly. The plant ends up doing it anyway without a clear contract, or the shipment waits at the port. EXW also leaves the plant with little incentive to load carefully. A quote under EXW looks lowest because it leaves out inland freight, export fees and terminal charges. Add those back before you compare.

Use EXW when you have a forwarder that already works in the plant’s country and the plant agrees in writing that it will cooperate on export documents.

FCA: the cleaner version of EXW

Under FCA the plant delivers the goods, cleared for export, to the carrier or forwarder you name. The named place can be the plant’s own dock, where your forwarder collects, or a terminal or container yard. Risk passes at that point.

For a repeat buyer of molded parts, FCA at the plant dock or at the forwarder’s warehouse is often the best balance. You control freight cost, routing and insurance. The plant keeps the export paperwork, which it can handle better than you can. FCA also fits air freight and container loads, where FOB is technically wrong.

Agree two details in writing. The first is who loads the truck: under FCA at the seller’s premises the seller loads, at other places the buyer unloads. The second is the cut-off time for pickup, so the plant knows when cartons must be ready.

FOB: familiar and still common

FOB means the plant delivers the goods on board the ship you nominate at the named port, usually with export clearance done and the loading fee paid by the plant. Risk passes when the goods are on board. You book the ship and pay the ocean freight.

Many buyers and plants use FOB by habit, and it works well for full container loads shipped by sea. Two points to watch:

  • If the container is handed to a carrier at an inland depot or terminal, risk may pass earlier than the quote implies. FCA describes that case more accurately.
  • Plants sometimes add “FOB charges” for terminal handling, bills of lading and documents. Ask what is included in the FOB price and what is billed separately, and make the list part of the quote.

CIF, CFR and the landed freight number

Under CFR the plant pays sea freight to your destination port. CIF adds minimum insurance cover. Risk still passes at loading, so the plant pays for the voyage but you carry the risk during it. That split surprises buyers.

These terms help when you need a freight number for budgeting and do not want to run a forwarder. The drawback is control. The plant chooses the carrier, the sailing and often the cheapest option, which can mean slower transit. If your production line stops on late parts, you want to choose the freight yourself. For the build-up of lead time, see injection molding lead time.

Need a quote for a molded part? Get matched with a molding plant

DDP: one price, hidden parts

Under DDP the plant delivers the goods to your door with import clearance done and duty and taxes paid. It looks convenient. It also means the plant, or its forwarder, acts as the importing party, which many plants have never done and some countries restrict.

In the United States and the European Union the importer of record carries legal duties: correct classification, correct customs value, correct origin and payment of duty. If a plant or forwarder declares a low value to give you a tempting DDP price, the compliance problem lands on the party named as importer. For regulated markets, most buyers prefer to be the importer of record themselves, so DAP or FCA gives a cleaner paper trail.

DDP also hides the freight and duty from you. When a tariff changes, the plant may ask to reprice the order or may absorb the change, depending on how the contract is written. Our post on plastic parts tariffs in 2027 covers the mechanisms and what to verify. If you choose DDP, ask for the price split into parts, freight, duty and clearance, even if you only pay the total.

Molds follow different rules from parts

A mold is a high-value, reusable asset, and it usually moves once: from the plant to you, or between plants. A few points apply:

  • Quote the mold under its own term, often FCA, with a separate line for crating and export packing.
  • Insure it. A mold that weighs a few hundred kilograms or more can be worth tens of thousands of dollars, and a drop in transit can crack steel.
  • Check customs treatment. Some countries treat tooling that returns to the plant as a temporary export or import, with a different declaration. Ask your broker.
  • Document ownership with a bill of sale or similar paper, because customs may ask whether the mold is being sold or only held.

The transfer steps are in the injection mold transfer checklist.

What to put in the PO

Write the term the same way in the quote, the PO and the commercial invoice:

  1. The term and the named place: “FCA plant dock, Binh Duong, Incoterms 2020”.
  2. Who books freight and who pays each cost line.
  3. Packing standard and carton marking, as covered in export packing for molded parts.
  4. Insurance: who buys it, for what value and which clauses.
  5. Documents the plant provides: commercial invoice, packing list and certificate of origin if you need one.
  6. The HS code the plant will use for the parts, so duty and origin claims match what you expect.
  7. Who pays if the shipment is delayed or the container is rolled.

If you compare quotes from several plants, also read how to compare injection molding quotes so that freight terms are normalized before you look at piece price.

Choosing in practice

  • First order, unknown forwarder: FCA with a forwarder the plant already knows, or CIF to get a landed figure. Switch to your own forwarder once the process is stable.
  • Repeat orders by sea: FOB or FCA, with your forwarder booking the ship.
  • Urgent parts by air: FCA or CPT to the airport, with the air waybill in your name.
  • No import experience at all: a forwarder or customs broker is worth paying for. DDP can work, but compare it against DAP and a broker fee first.

Whatever the term, put the freight budget next to the piece price when you rank quotes. A piece price that is 3 percent lower under EXW can end up higher once inland haulage, export fees and handling are added.

Next step

Incoterms are one line in a request for quote, and the quote should state them clearly. If you want a plant to quote your part under FCA or FOB with the freight split shown, send an RFQ. We are a manufacturers’ representative: we match each RFQ to the one partner plant whose lane fits the press range, resin and part type, and you order from that plant directly. The service is free for buyers, and the plant pays us a commission on orders from buyers we introduce.

Frequently asked questions

Which Incoterm is best for a first order of molded parts from Asia?

FCA or FOB with the buyer booking freight is a common starting point. The plant clears export and hands over at a named place or port, and you keep control of the forwarder, the routing and the insurance. DDP looks simple on paper but hides freight, duty and clearance costs inside one price, which makes it hard to compare quotes.

Does the Incoterm change who owns the goods?

No. Incoterms 2020 deal with delivery, risk transfer, costs and customs duties. They say nothing about when title passes or about payment terms. Put payment milestones and title in the purchase order or contract.

Can I use FOB for air freight or for parts packed in a container?

FOB, CFR and CIF are written for sea and inland waterway transport. For air freight, trucks or containers handed to a carrier at a terminal, the ICC recommends FCA, CPT or CIP. Many buyers still write FOB for containers, which works in practice but leaves a gap on who bears risk between the terminal and the ship.

Need a quote for a molded part?

Send the model. We match it to the partner plant whose lane fits and reply within 24 business hours. Free for buyers.

Get matched with a molding plant

Keep reading