Injection molding cycle time is the time from one mold closing to the next, and you can estimate it with a short sum: injection time plus cooling time plus mold open, eject and close time. Cooling is usually the biggest piece, and it depends mostly on the thickest wall of the part. Once you have the cycle, divide it by the number of cavities and multiply by the machine hourly rate to see the machine share of the piece price. The method gives a rough figure for comparing quotes, not an exact one.
The parts of a cycle
| Phase | What happens | Typical share |
|---|---|---|
| Mold close | Mold halves close and clamp | 1 to 3 s on small to mid presses |
| Injection (fill) | Melt enters the cavity | 0.5 to 3 s for most parts |
| Pack and hold | Pressure holds until the gate freezes | Counted inside the cooling timer on many machines |
| Cooling | Part cools until stiff enough to eject | Often 50 to 80 percent of the cycle |
| Mold open and eject | Mold opens, ejectors push the part out, robot or drop | 1 to 4 s |
| Plasticizing | Screw feeds the next shot | Runs during cooling, usually not extra |
The sum of the closed-mold time (fill plus cooling) and the moving time (close, open and eject) is the cycle. The mold opening and closing time depends on the press and the stroke the mold needs. The press supplier’s dry cycle time is a good starting number for the moving time.
Step 1: estimate the cooling time
The thickest wall decides the cooling time, since that area is the last to become stiff. A standard formula for a flat plate gives an estimate:
cooling time = (s² / (π² × α)) × ln( (4 / π) × (Tmelt − Tmold) / (Teject − Tmold) )
Where:
- s is the wall thickness in mm.
- α is the thermal diffusivity of the resin in mm² per second (about 0.1 for many amorphous resins such as ABS; check the data sheet).
- Tmelt is the melt temperature.
- Tmold is the mold surface temperature.
- Teject is the average part temperature at which the part is stiff enough to eject, often near the heat deflection temperature.
The formula assumes uniform thickness and good cooling. It is an estimate. Real molds have cooling channel layouts, hot spots and cooling that is not ideal. Plants use experience and mold flow results to refine it.
Worked example
An ABS part with a nominal wall of 3 mm. Use α = 0.1 mm²/s, melt 230 °C, mold 50 °C and ejection at 90 °C.
- The temperature ratio: (230 − 50) / (90 − 50) = 4.5.
- The logarithm term: ln( (4 / π) × 4.5 ) = ln(5.73) = about 1.75.
- The geometry term: 3² / (π² × 0.1) = 9 / 0.987 = about 9.1.
- Cooling time: 9.1 × 1.75 = about 16 seconds.
The same part at 2 mm wall gives 4 / 0.987 × 1.75 = about 7 seconds. The thinner wall cuts cooling by more than half, which shows why wall thickness is the strongest cost lever in the design. See injection molding wall thickness.
Step 2: estimate fill and moving time
- Fill time: from a flow study or experience. For small to mid parts, 1 to 2 seconds is common (typical). Large parts or thin walls with long flow can take longer.
- Mold motion and ejection: take the press dry cycle time for the mold stroke, or use 3 to 5 seconds as a starting range for small to mid presses (typical). Add time if a robot removes the part or if slides and lifters move before ejection.
Build the cycle:
| Case | Fill | Cooling | Moving | Cycle |
|---|---|---|---|---|
| ABS, 3 mm wall | 1.5 s | 16 s | 4 s | about 21.5 s |
| ABS, 2 mm wall | 1.5 s | 7 s | 4 s | about 12.5 s |
Step 3: from cycle time to parts per hour
Shots per hour = 3600 / cycle time.
Parts per hour = shots per hour × number of cavities × efficiency.
Efficiency covers stops, short interruptions and slow starts. A plant often plans on 85 to 95 percent for a stable job (typical), and lower for a job with manual steps.
For the 3 mm part in a 4-cavity mold at 90 percent efficiency:
- Shots per hour: 3600 / 21.5 = about 167.
- Parts per hour: 167 × 4 × 0.9 = about 600.
The same mold with the 2 mm wall: 3600 / 12.5 = 288 shots, giving 288 × 4 × 0.9 = about 1,037 parts per hour.
Need a quote for a molded part? Get matched with a molding plant
Step 4: machine cost per part
Machine cost per part = machine hourly rate / parts per hour.
With an illustrative rate of 30 USD per hour (a placeholder for the math, not a quote or a typical rate), the 3 mm part carries about 30 / 600 = 0.05 USD of machine time, and the 2 mm part about 0.03 USD. The saving comes only from the cycle, with the same mold and the same machine. Real hourly rates depend on press size, region and what the rate includes. See injection molding machine hourly rate.
Add material cost (part weight plus runner and scrap, times resin price), labor, packing and overhead to reach the piece price. The full structure is in injection molding cost per part.
What changes the cycle time
Design levers:
- Reduce the thickest wall, or core out thick sections.
- Make walls uniform. One thick boss can hold the whole cycle.
- Avoid deep ribs that cool slowly.
- Remove undercuts that need slow moving slides. See undercut injection molding.
Mold levers:
- Better cooling channels near hot spots, or conformal cooling for complex parts.
- Mold steel and inserts with higher conductivity where needed, such as copper alloy inserts in thick cores.
- Ejector system that releases the part reliably without waiting.
- Hot runner, which removes runner cooling as the limit. See hot runner vs cold runner.
Process levers:
- Lower melt temperature within the resin window.
- Lower mold temperature when the resin allows it.
- Faster injection and mold motion.
- Parallel actions, such as moving the robot in while the mold opens.
Material levers:
- A resin that reaches stiffness at a higher temperature can eject sooner.
- The resin data sheet gives the recommended ejection temperature and thermal data. Semi-crystalline resins such as PP and PE release heat differently from amorphous ones such as ABS, so the plain formula is only a first estimate for them.
Pushing cycle time down too far has costs: warpage from uneven cooling, residual stress and dimensional drift. A plant that quotes the shortest cycle in the group is not always the best price. Ask how the cycle was chosen and whether it was tested at T1. See warpage in injection molding.
What to ask the plant
- What cycle time is the quote based on, and how was it confirmed?
- How many cavities and what efficiency?
- What machine and what hourly rate?
- Which phase limits the cycle: cooling, ejection or mold motion?
- What cycle will the T1 trial run at, and what is the target after optimization?
Compare plants on the same assumptions. For the other quote items, see how to compare injection molding quotes.
Working with a rep
We are a manufacturers’ representative for injection molding plants. Buyers pay nothing for the introduction; the plant pays us a commission on orders from buyers we introduce. Send an RFQ with the drawing, resin and annual volume, and ask the plant to state the cycle time, cavities and machine it assumed. We route the RFQ to the partner plant whose lane fits the part.
Frequently asked questions
What is a typical injection molding cycle time?
Thin walled small parts can cycle in 10 to 20 seconds, general parts with 2 to 3 mm walls in 20 to 40 seconds and thick or large parts in a minute or more (typical ranges). The wall thickness, resin, mold cooling and press speed decide the actual number.
Why does a thicker wall make the cycle so much longer?
Cooling time grows roughly with the square of the wall thickness. A wall twice as thick needs about four times the cooling time, because heat must travel through the plastic to the cold mold steel. Since cooling is usually the largest part of the cycle, wall thickness is the main lever on cycle time.
Can the buyer check the plant's cycle time?
Yes, in a reasonable way. Ask the plant for the cycle time it assumed, the number of cavities and the machine hourly rate. Compare the cycle with an estimate from the wall thickness and resin. If it is much longer than a rough calculation suggests, ask what limits it: cooling design, part ejection, a slow press or a safe margin.
Need a quote for a molded part?
Send the model. We match it to the partner plant whose lane fits and reply within 24 business hours. Free for buyers.
Get matched with a molding plant