An injection molding machine hourly rate is the total cost of running one press for one hour, including the machine itself, the people around it, power, maintenance and a share of the plant’s overhead. Export buyers do not usually ask for it, but every piece price you quote depends on it. A plant that knows its real press-hour rate can quote with confidence, say no to jobs that lose money and defend its price when a buyer pushes back.

Why the rate matters in an export quote

A piece price has two parts: material and conversion. Material is easy to see. Conversion is the cost of turning pellets into a part, and press time is its largest piece. If your hourly rate is too low you win orders and lose money. If it is too high you lose orders you could have made at a profit.

Overseas buyers compare quotes from several regions. They do not see your rate, but they see the result. A clear, defensible rate also helps when a buyer asks why a quote moved after a change in cycle time or an added operation.

The cost elements of a press-hour

Build the rate from these blocks. Use your own numbers, not an average from the internet.

Element What goes in How to measure
Machine depreciation Purchase price divided by useful life Asset register, years of life you actually use
Cost of capital Interest on loans or the return you want on money tied up Bank rate or target
Auxiliary equipment Dryer, hopper loader, mold temperature controller, chiller share, robot Same method as the press
Direct labor Operator, setter, material handler share Wages plus social costs, divided by presses covered
Electricity Average kW drawn during a running hour Meter readings, not nameplate
Maintenance and spares Planned maintenance, repairs, hydraulic oil, screw and barrel wear Last year’s spend per press
Floor space and utilities Rent or depreciation of the building, water, compressed air Allocate by area or by tonnage
Overhead Management, quality, planning, IT, insurance, admin Allocate by hours or by revenue
Margin Profit you need per hour Policy decision

Most plants miss at least one of these. The usual gaps are auxiliary equipment, maintenance and the setter’s time for mold changes.

The formula

A simple, honest method:

Hourly rate = (annual fixed cost + annual running cost) / productive hours per year

Productive hours are not 8,760, the number of hours in a year. A press never runs 24 hours a day, 365 days a year. Subtract Sundays and holidays if you do not run them, mold changes, maintenance, waiting for material, waiting for operators and sample trials. The result is the number of hours that produce good parts, which is usually well below the calendar total.

If the plant has run 5,500 productive hours on a press in an ordinary year, use that number, not the theoretical maximum.

A worked example

The numbers below are an illustration of the method. They are not market rates, and your costs will differ.

Press: 150 t electric or servo-hydraulic machine, bought for 80,000 USD, used for 10 years.

  • Depreciation: 80,000 / 10 = 8,000 USD per year
  • Auxiliary equipment (dryer, loader, controller) at 15,000 USD over 10 years: 1,500 USD per year
  • Cost of capital at 8 percent on half of the combined press and auxiliary cost (95,000 USD): about 3,800 USD per year
  • Maintenance and spares: 3,000 USD per year
  • Floor space and utilities share: 2,500 USD per year
  • Direct labor: one operator covers two presses at 6,000 USD per year, so 3,000 USD per press, plus a setter’s share at 2,000 USD, giving 5,000 USD per press
  • Electricity: assume a 12 kW average draw over 5,500 hours at 0.10 USD per kWh, which is 12 x 5,500 = 66,000 kWh, or 6,600 USD
  • Overhead allocation: 10,000 USD per press per year

Total yearly cost: 8,000 + 1,500 + 3,800 + 3,000 + 2,500 + 5,000 + 6,600 + 10,000 = 40,400 USD.

At 5,500 productive hours: 40,400 / 5,500 = about 7.35 USD per hour before margin.

At 3,500 productive hours (a slow year): 40,400 / 3,500 = about 11.55 USD per hour.

The same press costs 57 percent more per hour in the slow year. Fixed costs do not shrink when the press stands still. This is why utilization is the biggest lever on a plant’s economics and why a rate must be built from a realistic number of hours.

Utilization: the number everyone gets wrong

Two ways to count hours:

  • Calendar utilization: hours the press made good parts divided by all hours in the year.
  • Scheduled utilization: hours the press made good parts divided by hours you planned to run.

For pricing, use the calendar view, because the costs are incurred for all hours. Many plants think they are at 85 percent and discover on the record that they are nearer 55 to 70 percent. Pull the press logs for the last 12 months. If you do not have logs, start with the molding machine’s shot counter and cycle time to estimate hours.

Another trap is the mold change. If a press runs a job for one week and then sits for a day waiting for a new mold, price in the setup. Short runs carry a higher cost per piece because the changeover hours must be spread over fewer parts.

Run an injection molding plant? Join as a partner factory

From press-hour rate to piece price

Once you have a rate, convert it.

  1. Start with the cycle time in seconds (see injection molding cycle time calculation).
  2. Divide by cavities to get seconds per part.
  3. Divide by an efficiency factor. If the press will be productive 90 percent of the time while running this job, divide by 0.90. Be honest about start-up scrap, jams and operator pauses.
  4. Multiply by the hourly rate divided by 3,600 to get the conversion cost per part.
  5. Add material, including the runner share if the runner is scrapped, plus scrap allowance.
  6. Add secondary operations, inspection, packing and freight to the agreed Incoterm.
  7. Add margin.

Take a part with a 30 second cycle and 4 cavities, an all-in rate of 12 USD per hour (margin included) and 90 percent efficiency: 30 / 4 = 7.5 seconds, / 0.90 = 8.33 seconds, x 12 / 3,600 = about 0.028 USD of press cost per part. The press is a small piece of the price on a small part. It is a large piece on big parts with long cycles. A part that takes 90 seconds on a single cavity costs about 0.33 USD in press time at the same rate. The calculation keeps you honest about where your price comes from.

Rates by press size

Larger presses cost more to buy, to run and to hold in a plant. Many plants build a rate table, one line per press range, then place each mold on the right press. Putting a small mold on a large press wastes money, because you pay for clamp you do not use. Putting a large mold on a small press may not fit at all. The tonnage depends on projected area and resin, so check the press range before you quote. Our post on how many cavities an injection mold needs shows how cavity count interacts with press choice.

What not to do

  • Do not copy a competitor’s rate. Their equipment, labor and overhead differ from yours.
  • Do not leave out overhead. A rate that covers only the machine and operator leaves the quality lab, planner and rent unfunded.
  • Do not quote one rate for all presses. It overcharges small jobs and undercharges large ones.
  • Do not forget currency. If your costs are in dong and your quote is in dollars, review the rate when the exchange rate moves.
  • Do not set the rate once and forget it. Revisit it every year or whenever a major cost changes, such as power tariffs or wages.

Review and use

Treat the rate as a controlled number. Review it every year using actual cost and actual hours. Keep one version per press class, with a date. When a quote is challenged, you can explain it with the same sheet. Do not share the sheet with buyers unless you decide to.

A buyer who sees consistent quotes across revisions will trust the plant more. For more on what overseas buyers expect, read how to win overseas injection molding customers.

Where we fit

We are a manufacturers’ representative for audited injection molding plants. Buyers pay us nothing; the plant pays a commission on orders from buyers we introduce. If you run a molding plant and want to be considered for a lane, see for factories.

Frequently asked questions

Should I quote different hourly rates for different presses?

Yes. An 80 t press with a simple dryer costs less to own and run than a 450 t press with a robot, chiller and larger tool changes. Build one rate per press or per press class, then use the rate of the press the mold will actually run on.

Do I show the hourly rate to the buyer?

Most plants keep the rate internal and show only the piece price and tooling price. Some buyers ask for an open breakdown on large programs. Decide your policy before you quote and apply it the same way to every buyer.

How do I handle a rate when I am not sure of utilization?

Use a conservative utilization based on your past press records, not on the best month. If the press has been busy about 65 percent of calendar hours, price at that level. A rate built on 95 percent will lose money in every ordinary month.

Run an injection molding plant?