Guides / Cost
How many cavities should your injection mold have? A volume and cost method
October 30, 2026
The right number of cavities in an injection mold comes from four limits: how many parts you need per year, how fast one cavity can make them, how big a press the part and plant allow and how much extra mold cost the piece price saving can repay. Start with a volume and cycle time calculation to find the minimum cavity count. Then check the press limits and the cost curve. For many programs the answer is 1, 2 or 4. Rarely is the largest mold the cheapest over the life of the program.
What a cavity count really changes
A cavity is one copy of the part in the mold. Add cavities and each shot makes more parts. Press time per part falls in proportion, while the cycle time stays almost the same. That is the whole benefit. The cost is a bigger mold, a more complex runner, a larger press and a harder job to keep every cavity making the same part.
Cavity count affects four things at once:
- Mold price. More steel, more machining, more fitting.
- Piece price. Press time per part drops, so the machine-time line falls.
- Press size. More cavities need more clamp force and more shot volume.
- Risk. One mold now holds more of your capacity. A damaged cavity or blocked gate affects a bigger share of output.
Step 1: find the minimum cavities from volume
Use this formula:
Cavities = (annual volume x cycle time in seconds) / (available press hours x 3,600 x efficiency)
Available press hours means the hours you can expect on that mold in a year, not the hours in a calendar. Plants run several molds on the same press, so a realistic figure for a dedicated press is around 5,000 to 6,500 hours a year across a multi-shift schedule. Efficiency covers startup, mold changes, maintenance and reject runs. A typical planning figure is 80 to 90 percent.
Example A: 500,000 parts a year, 30 second cycle, 5,000 press hours, 85 percent efficiency. 500,000 x 30 = 15,000,000 seconds of work. One cavity gives 5,000 x 3,600 x 0.85 = 15,300,000 seconds. The answer is 0.98, so one cavity covers it, with no spare capacity.
Example B: 2,000,000 parts a year, same cycle. 2,000,000 x 30 = 60,000,000 seconds. Divide by 15,300,000 and you get 3.9. Four cavities fit, at nearly full use of the press.
These are planning figures, not guarantees. Real cycle time depends on the part and the plant’s process, so check it against how injection molding cycle time is calculated.
Notice what the calculation does not say. In example A, the single cavity runs the press almost all year. A plant that sees that as a full press may not want to hold it for one customer. Two cavities would give breathing room for downtime and growth, at a higher mold price. This is a business choice, not a formula.
Step 2: check the press limits
The calculation gives a target. The press decides whether it is possible. Three limits matter.
Clamp force. The press must hold the mold shut against the pressure of the melt. Clamp force needed is roughly the total projected area of all cavities and runners multiplied by the cavity pressure. A planning range often quoted is 2 to 5 tons per square inch of projected area, depending on resin, wall thickness and flow length. Thin walls and long flow paths need more. Doubling cavities roughly doubles the force needed.
Shot size. The screw must deliver the volume of all cavities plus runner in one shot. A common planning range is shot weight at 20 to 80 percent of the barrel’s capacity. Too small a shot for the barrel leaves plastic sitting in heat too long. For heat-sensitive resins this causes degradation.
Platen and tie bar space. The mold must physically fit between the tie bars, with room for daylight to eject the part. A big multi-cavity mold may push you to a larger press than you wanted, and a larger press costs more per hour.
If the calculated cavity count needs a press the plant does not own, either the mold goes to a different plant or the cavity count drops.
Step 3: weigh the cost curve
More cavities lower the piece price and raise the mold price. The curve flattens: the second cavity saves a lot, the eighth saves little.
| Cavities | Typical mold cost vs single cavity | Press time per part vs single cavity | Typical fit |
|---|---|---|---|
| 1 | 1.0x | 1.0x | Prototype, low volume, large parts |
| 2 | About 1.4 to 1.8x | 0.5x | Moderate volume, mid-size parts |
| 4 | About 1.8 to 3x | 0.25x | Medium to high volume |
| 8 | About 3 to 5x | 0.125x | High volume, small parts |
| 16 or more | Often 5x and above | Under 0.07x | Very high volume, small simple parts |
These ratios are broad and typical. Part size, runner type, steel and region change them. Treat the table as a prompt for questions, not a price list.
To decide, compare total cost for two or three options: total cost = mold price + (piece price x total parts). Run it at your forecast volume and at half of it. If a 4-cavity mold only wins at your highest forecast, the 2-cavity mold is the safer pick. Injection molding cost per part shows how the piece price lines move with cavities.
Need a quote for a molded part? Get matched with a molding plant
Step 4: consider quality and consistency
More cavities mean more variation. Each cavity has slightly different dimensions, gate size, cooling and venting. Melt does not split perfectly evenly, so cavities furthest from the sprue can fill differently. A balanced runner layout and hot runner control reduce this, and multi-cavity mold balance covers how plants check it.
If your part has tight tolerances, a single cavity or a small number of cavities gives you the best consistency. For critical dimensions, ask for:
- A cavity-by-cavity dimensional report at T1.
- Cavity numbers marked on every part, so a bad part traces to a cavity.
- A process that can run with one cavity blocked off if needed, though this is not always possible with a hot runner.
- A plan for cavity-specific corrections.
For aesthetic and clear parts, balance and gate vestige matter. More cavities usually mean more compromises in gate location.
Step 5: think about the program, not just year one
Volume changes. A product that starts at 100,000 a year may reach 1,000,000 or may fall. Three common approaches:
- Start small, build a second mold later. Lowest upfront cost. Good when demand is uncertain. The second mold is a known-good copy of the first.
- Build the final cavity count from day one. Best piece price. Risk is a mold built for volume that does not arrive.
- Use a prototype or bridge mold first, then decide on production cavities. Lets you validate the design before the larger investment. See aluminum vs steel injection molds for when a bridge mold fits.
A reasonable rule: size the production mold for the volume you are fairly confident of in year two, not the best case in year five.
Special cases
Family molds. Different parts in one mold. They save tool cost at low volume but fill unevenly, and you cannot run one part without the others. Use with parts of similar size, weight and resin, in the same color.
Large parts. A big housing or panel is usually a single cavity because the press, not the volume, is the limit.
Hot runner molds. The runner is part of the mold price, so adding cavities raises it. The saving in waste and cycle often repays it at higher volumes.
Insert and overmolded parts. Loading inserts by hand limits the number of cavities an operator can load per cycle. Automation changes this.
What to ask the plant
When you request a quote, give the annual volume and ask the plant to propose a cavity count with reasons:
- What cavity count do you recommend and why?
- What press tonnage, shot size and cycle time did you assume?
- What is the mold price and piece price at one other cavity count?
- How is balance verified, and what is the cavity-to-cavity variation limit?
- Can the mold run with a cavity shut off?
Send the full package from injection molding RFQ: what to send for a firm quote so the answers can be compared.
Next step
If you have a part and a forecast and want a plant that can run the cavity count you need, send the RFQ. We are a manufacturers’ representative: we match your request to the one partner plant whose lane fits, you order from that plant directly, and it costs the buyer nothing. The plant pays us a commission on orders from buyers we introduce.
Frequently asked questions
Does a 4-cavity mold cost four times as much as a single-cavity mold?
No. The mold base, ejection system and much of the design work are shared, so a 4-cavity mold often costs roughly 1.8 to 3 times a single-cavity mold for the same part. The exact ratio depends on part size, runner type and steel. Ask the plant to quote the same part at two cavity counts.
Can I add cavities to a mold later?
Sometimes, if the mold base was built with room for them, but it is rare and rarely cheap. Most buyers instead build a second mold when volume grows. Ask the plant at quote stage whether a larger base is worth building now to leave room, and what the extra steel and cutting cost.
Do all cavities make identical parts?
They should, but small differences exist. Each cavity has its own dimensions, gate and cooling, so part weight and size vary slightly between cavities. Ask for a cavity-by-cavity first article report and mark each cavity number on the mold so a problem part can be traced to its source.
Need a quote for a molded part?
Send the model. We match it to the partner plant whose lane fits and reply within 24 business hours. Free for buyers.
Get matched with a molding plant